The analysis of the antenna system was the reason for this trip to Atbara (North of Khartoum) in Sudan.
The complete system including the transmitter was from Denki Kogyo Co. Ltd., NEC Corporation back in 1985.
The existing 5 kW transmitter was to be replaced by a 10 kW transmitter from TELEFUNKEN.
It was necessary to carry out investigations in advance to find out which modifications would be needed to enable the increase of the power from 5 to 10 kW.
|