Historical:
The cross dipole in Berlin- Britz was shut down after the reunification of Gemany. Later it was dismantled.
The height of the cross dipole was 0,1 lambda, because this design leads to a vertical pattern which was an optimum for the coverage of the former German Democratic Republic (GDR).
An article about cross dipoles see below.
|